The project included installing both underground and above-ground electrical cable infrastructure. Foundations were built for electrical substations, and EV charging stations were set up. Additionally, the reconstruction of one electrical panel was completed to improve its performance.
Challenges
One of the main challenges was carrying out switchboard reconstruction work at night, with only a limited window to disconnect the power. In addition, cable routes had to be installed under busy pedestrian pathways, requiring secure fencing around the work zones. Some sections were installed using directional drilling beneath the road surface, navigating between existing underground utilities.
Our approach
We focused on efficient planning, minimal disruption, and safe execution in a complex urban environment. We carried out critical tasks – such as night-time switchboard reconstruction and directional drilling under busy roads – with precision and careful coordination.
Results
The Electric Vehicle charging station with four charging points was successfully installed, meeting the growing needs of EV owners and contributing to the development of sustainable transport infrastructure.