The project included installing both underground and above-ground electrical cable infrastructure. Foundations were constructed for electrical substations, and distribution boards and EV charging stations were installed.
Challenges
Our main challenge was aligning electrical work timelines with the overall construction and installation schedules of the facility.
Our approach
We focused on efficient planning and execution to minimize disruptions.
Results
The Electric Vehicle charging station with eight charging points was successfully installed, meeting the growing needs of EV owners and contributing to the development of sustainable transport infrastructure.