This large-scale project involved installing above-ground electrical cable infrastructure within an underground garage. Foundations were built for electrical substations integrated with EV charging stations. Additionally, one electrical panel was reconstructed to enhance its performance.
Challenges
The switchboard reconstruction work was conducted at night to minimize the power disruption for building tenants.
Our approach
Key tasks, such as night-time switchboard reconstruction and cable installation in the underground garage, were carefully coordinated – efficient planning and execution helped minimize power interruptions.
Results
The Electric Vehicle charging station with twenty charging points was successfully installed, meeting the growing needs of EV owners and contributing to the development of sustainable transport infrastructure.